Q1
How long does a switchboard upgrade take?
Most residential switchboard upgrades are completed in a single day, including power isolation, board replacement, testing and re-energising. Larger boards or those requiring distributor coordination can take longer.
Q2
Do I need to upgrade my switchboard for an EV charger or air conditioner?
Sometimes. We assess your existing board's spare capacity, RCD protection and main supply before recommending an upgrade. If the board can safely take the new circuit, an upgrade isn't required.
Q3
Is a switchboard upgrade the same as adding a safety switch?
No. Adding an RCD (safety switch) to an existing board is a smaller job. A full upgrade replaces the enclosure, breakers and RCDs and brings the whole board up to current standards.
Q4
Will you provide an Electrical Safety Certificate?
Yes. Switchboard upgrades are prescribed electrical work, so we issue an Electrical Safety Certificate on completion as required under Energy Safe Victoria.
Q5
Do I need to disconnect the power for a switchboard upgrade?
Yes — power to the property is off while the board is replaced. Most residential upgrades are completed in a single day, and we plan the timing so fridges and freezers aren't off for long. Where meter isolation is required, we coordinate with your distributor.
Q6
My switchboard has an asbestos backing — is that a problem?
It's manageable. Asbestos backing boards were common until the late 1980s and are removed under the appropriate controls as part of the upgrade. We'll flag it in the quote so there are no surprises on the day.